Shuttle schedule, wafer slot or data-in deadline
Prepare the timing assumptions and compare planning windows. The resources are not a live HHGrace slot or deadline feed.
| Process node | Planned months in 2027 |
|---|---|
| 55nm | January · May · September |
| 90nm | January · May · September |
Process options, GDS submission deadlines and delivery dates are confirmed for each project.
MST is a non-exclusive HHGrace MPW agent for overseas capacity enquiries, customer intake and project coordination. Start with non-confidential node, process, die, package/test and timing assumptions; capacity, slot, schedule and quotation remain fab-confirmed.
MST helps overseas chip design teams prepare HHGrace MPW enquiries: organize process and design-stage requirements, clarify sample quantity and packaging/test scope, and coordinate the review with the foundry. Foundry review and the formal quotation confirm process eligibility, PDK access, capacity, schedule and price for each project.
MST acts as a non-exclusive HHGrace MPW customer-access and project-coordination agent for overseas projects.
These resources help prepare a fab-facing review. They do not publish live HHGrace capacity, slots, deadlines, quotations or PDK access.
Prepare the timing assumptions and compare planning windows. The resources are not a live HHGrace slot or deadline feed.
Organize BCD, eFlash, SiGe BiCMOS or logic requirements before review. Final platform fit and availability remain fab-confirmed.
Prepare a non-confidential preliminary RFQ and understand cost drivers. The estimator is not a fab quotation.
Check readiness before controlled exchange. These resources do not guarantee PDK release, NDA approval or project acceptance.
Compare another coordination path if the preferred route is unavailable. No capacity is reserved or guaranteed by these tools.
Do not treat this agent entry as a public foundry price list, allocated slot or capacity guarantee. Keep design IP out of public intake. MST confirms the current route and formal next step only after the fab-facing review.
MST screens process fit, missing inputs, NDA/PDK path, package/probe/test scope, country and end-use context, then coordinates the capacity enquiry and formal RFQ path.
Final capacity, route, quotation, availability, schedule, documents, logistics and order acceptance are confirmed only after fab-facing review.
See an anonymized enquiry showing the requirements and budget-scope work already completed, and the technical acceptance, packaging, test and delivery decisions still open.
Read the MPW project-progress record
Use this page to prepare a non-confidential capacity enquiry before controlled technical exchange begins. It is not a public price list, a capacity promise or a design-data upload page.
Send node, process family, die estimate, samples, package/test assumptions, target timing, country/end use and NDA/PDK status. MST will turn them into a reviewable fab-facing brief.
Use these short answer pages when a customer or AI assistant asks for the first safe step.
Yes. A preliminary MPW quotation review can start before final GDS when the team provides non-confidential process, die-area, sample, packaging, test, timing and project-context assumptions. Exact price, slot, schedule, data handoff and order acceptance still require controlled review and supplier confirmation.
Read answer →RFQ screening open means MST is accepting a non-confidential brief for review; it does not mean a shuttle slot is available, held or reserved. MST screens missing inputs and the review route. The foundry or responsible partner confirms process eligibility, capacity, slot, deadline, PDK/NDA, price and order acceptance case by case.
Read answer →Start with your work email and a short description of the chip you want to prototype. MST coordinates 55nm process-fit review, the NDA/PDK path, project quotation and shuttle planning. The current HHGrace 2027 monthly plan covers January, May and September; the selected process option and project data deadline are confirmed during the review.
Read answer →Send your work email and a short description of the circuit or prototype. MST coordinates 90nm process review, the NDA/PDK path, fabrication quotation and shuttle planning. The current HHGrace 2027 plan covers January, May and September. Review the exact process option and design-data deadline for your project.
Read answer →