Plan a 90nm MPW with MST: analog and power-device requirements, 2027 HHGrace shuttle planning, PDK, packaging and test scope, and a project quotation.

Start with a work email and a short project description. Detailed technical inputs can follow in the project discussion.

HHGrace 2027 MPW schedule

Process node Planned months in 2027
90nm January · May · September

Process options, GDS submission deadlines and delivery dates are confirmed for each project.

How can I start a 90nm MPW project with MST?

Send your work email and a short description of the circuit or prototype. MST coordinates 90nm process review, the NDA/PDK path, quotation and shuttle planning, including the package and test scope your samples need. The current HHGrace 2027 monthly plan covers January, May and September; the exact process option and project deadlines are confirmed during review.

Review the 90nm devices your circuit depends on

For an analog, mixed-signal or power-management prototype, the device menu and operating conditions are central to process selection. Identify the supply domains, signal interfaces and isolation needs before committing to a 90nm layout. The node alone does not specify an I/O rating, high-voltage device or embedded-memory option.

Design requirementWhat to defineWhat the process review checks
Mixed-voltage interfacesCore, I/O and any higher-voltage domains; interface levels, tolerances, sequencing and protection.Rated devices, level-shifting strategy, ESD approach and models for the required operating corners.
BCD / power-management requestPower-device voltages, current, safe operating area, isolation, losses and thermal assumptions.The exact BCD platform and device set, layout constraints, reliability conditions and eligible shuttle route.
Analog and sensor interfacesAccuracy, noise, matching, reference stability, supply variation and temperature targets.Suitable analog models and passives, verification conditions, package effects and characterization access.
Embedded memory and digital IPMemory function/capacity, retention and programming needs, logic libraries and interface IP.The specific available process option and licensed macros. A 90nm listing does not establish eFlash availability.

Read the detailed 55nm, 90nm and 40nm process-fit guide →

Compare a 90nm route with 55nm on the same requirements

Start with the devices and interfaces that cannot change. Then compare the candidate PDKs, reusable IP, estimated area, verification effort and package/test plan. A smaller nominal node is useful only when its eligible process can implement the circuit and deliver the measurements the prototype needs.

Explore 55nm MPW services →

What your quotation should cover

A useful quotation names the agreed work and deliverables. The following checklist helps the engineering and purchasing teams compare the same scope.

Process and design area

The exact foundry/process option, die dimensions, booked block area, required libraries and licensed IP. Die area and the billable MPW allocation should be identified separately.

Fabrication and sample delivery

The manufacturing scope, wafer or die delivery form, agreed quantity, acceptance criteria and accompanying records. Confirm whether thinning, dicing and shipment are included.

Packaging and test

Package development, assembly, wafer probe, final test and characterization are separate scope decisions. State the required measurements and reports so the quotation describes comparable work.

Project terms

Engineering work, third-party charges, tax, freight, quotation validity and payment milestones are specified in the written quotation. Confirm the assumptions that can change the scope.

Receive the commercial quotation through your private MST project discussion.

From requirements to samples

Use a shared scope and handoff record across design, fabrication and downstream work. The quotation determines which stages MST coordinates for your project.

StageWork and responsibilityStage output to confirm
RequirementsMST organizes the application, node/process, sample and timing assumptions into a project brief.A requirements summary with missing inputs and the next technical questions.
Process and PDKMST coordinates the foundry review and NDA/PDK access path for the proposed project.Exact process option, permitted PDK/library revisions and acceptance requirements.
Quotation and runMST aligns the manufacturing scope, sample form and downstream work with the proposed shuttle.A written quotation and project-specific data deadline and schedule assumptions.
Tapeout handoffThe design owner supplies the approved design revision and verification evidence through the agreed controlled channel.A versioned handoff list and confirmation of design acceptance for the run.
Fabrication and downstream workMST follows up manufacturing and any separately agreed dicing, packaging or testing.Progress against the agreed milestones and the scope of any changes.
Samples and evaluationThe agreed material and supporting records are handed over for the customer’s evaluation.Delivery quantity/form, available test records and the next evaluation or respin decision.

After first-silicon evaluation, use the measured results to decide whether to revise the design, join another MPW or investigate a dedicated production run. The next manufacturing stage is scoped separately.

An example first enquiry

Use the parts you already know; an initial message does not need to answer every technical question.

We are planning a 90nm [analog / mixed-signal / power-management] prototype for [application]. Our voltage domains are [requirements], with [critical device or isolation needs]. Estimated die size is [dimensions or unknown], and we need [sample form/quantity] for [measurements]. We are targeting [month] 2027. Please advise the process, package/test and quotation review.

Keep GDS, PDK files, proprietary schematics and other design IP for the agreed NDA and controlled transfer path.

Request a 90nm MPW quote →

Tools and practical preparation

MPW Node Selection Advisor

Turn device and voltage requirements into a consistent process-review brief.

Open tool →

Package selection helper

Organize package assumptions before an assembly supplier reviews the die and interface.

Open tool →

MPW handoff handbook

Work through layout/revision checks, a handoff list and sample test-plan examples.

Open tool →

These resources help organize assumptions and checks. The design owner and foundry approve the actual design and process handoff.

Read the MPW community guides on preparation, quotation scope, handoff, packaging and test →

90nm MPW questions

What are the 2027 90nm MPW shuttle months?

MST’s current HHGrace 2027 plan lists January, May and September for 90nm. Exact process eligibility, booking and design-data deadlines, capacity and delivery milestones are confirmed for the project.

Is every 90nm MPW a BCD or high-voltage process?

No. Logic, analog and BCD options have different device sets and rules. State the required voltage domains, power devices and isolation so the exact platform can be reviewed. A high-voltage rating from another node or foundry cannot be assumed to apply.

What if the available I/O voltage differs from my requirement?

Record the required core and interface levels and identify the mismatch before design acceptance. The design team and foundry must review whether another device or interface implementation is suitable. Do not assume that a different voltage option is interchangeable.

What information is needed to scope packaging and electrical test?

After the initial enquiry, scoping normally needs die dimensions and thickness, pad/bump information, package and pinout requirements, sample quantity, electrical limits and a test plan describing stimuli, expected outputs and measurement conditions. Controlled drawings and design details are exchanged through the agreed private channel.

Can I begin a 90nm MPW enquiry without a finished design?

Yes. Start with a work email and a short description. MST can identify the next process and quotation questions from preliminary requirements; final GDS and verification evidence are needed later for the accepted tapeout handoff.

Process information and the MST service role

MST coordinates process review, quotation and project follow-up for global chip teams. For the HHGrace route, MST is a non-exclusive customer-access and project-coordination agent. Exact process eligibility, PDK access, capacity and project acceptance are confirmed with the responsible foundry.