55nm MPW Shuttle Options for eFlash, Logic and RF
Use the public TSMC, UMC, and HHGrace records to shortlist a 55nm prototype route and get quotes you can compare.
A multi-project wafer (MPW) shuttle lets several chip designs share a mask set for prototyping. If your 55nm design depends on embedded flash, a particular RF device, or a specific standard-cell library, start with that requirement. Use it to screen the exact process options before comparing dates and prices.
Published 55nm shuttle options
| Route | What the public sources show | What to confirm for your project |
|---|---|---|
| TSMC directly or via EUROPRACTICE | TSMC names 55nm in its CyberShuttle program. The EUROPRACTICE 2027 plan lists a May run for TSMC 55nm CMOS logic or mixed-signal/RF, with general-purpose, low-power, or ultra-low-power variants listed. TSMC 2025 Form 20-F and EUROPRACTICE 2027 schedule. | For the direct route, check the latest schedule with a TSMC representative or through TSMC-Online if you are a customer. For the listed May run, ask EUROPRACTICE about eligibility, the exact process design kit (PDK), and any remaining space. TSMC CyberShuttle. |
| UMC Silicon Shuttle | UMC describes its 55SP process in its technology portfolio. Its public 2026 Silicon Shuttle plan groups 55nm and 65nm together. UMC 55nm process portfolio and UMC Silicon Shuttle. | Ask UMC sales or check MyUMC for the current schedule. Request the exact 55nm process on that run, whether it supports your device options, and whether space is open to your project. |
| HHGrace via MST Singapore | Hua Hong Semiconductor’s 2025 annual report says its 55nm embedded flash (eFlash) process reached volume production. MST lists January, May, and September as 2027 planning windows for HHGrace 55nm. Hua Hong Semiconductor 2025 Annual Report, p. 38 and MST 55nm HHGrace process and schedule page. | Ask MST to review the process requirements and check the PDK path. Request foundry confirmation of project eligibility, the run, and the final design data deadline. |
Compare costs for the same delivered samples
MST’s published budget reference covers prototype fabrication for a 5 × 5 mm allocation on a 2027 HHGrace 55nm or 90nm shuttle. Packaging, electrical testing, and shipping are quoted separately. Ask for the billable minimum and a project quote for your actual design. See the published HHGrace budget range and quote scope.
Ask each coordinator to quote the same die dimensions, sample quantity, and delivery form. A fabrication quote may cover a fixed block, an area charge, or a shuttle seat. Get the minimum charge, included sample count, currency, and quote expiration date. If you need packaged and tested chips, include any separate charges for dicing, assembly, probe, electrical test, and shipping in the comparison.
Send the same brief to each route
- Process and design kit. Give the process family and the features first silicon must have. For eFlash, state capacity, endurance, and retention. For RF, give the frequency range and any required devices or passives. Ask for the exact process, PDK version, available libraries or IP, and supported signoff tools.
- Area and sample requirements. Share estimated die width and height, the prototype sample count, and whether you need bare die or packaged, tested parts. Ask how the provider measures billable area, including any seal-ring or scribe clearance requirements, and who handles each packaging and test step.
- Time to samples. Give your design-ready date and the date you need samples. Ask for the reservation deadline, final design data deadline, and estimated shipment date on separate lines. Have the coordinator verify current space for the named process.
- Eligibility and access. Share the buying entity, country, end use, and current NDA and PDK status. Ask who approves access, what is needed for that review, and when your designers can get the exact PDK. Keep layout and proprietary IP for the controlled review channel.
Record the date and source of each confirmation. If the exact process, eligibility, or deliverables are still open, assign an owner and a date to resolve them before committing to a run.
Find an access route or start an RFQ
The MPW Access Map covers additional routes and intake models. If you want MST to review an HHGrace project, follow the guide to starting an MPW RFQ before final GDS and send a non-confidential brief.
Public sources checked November 23, 2026.
Related Articles
Ready to plan your MPW and first-silicon path?
Start with a non-confidential brief covering node/process fit, schedule, first-silicon validation, packaging/test, sample handling or re-spin needs. MST routes the request for review; feasibility, availability, timing and quotation are confirmed case by case.