Free MPW tool

Check your MPW tapeout readiness before RFQ.

Score the high-level inputs a coordination team needs before a useful MPW first screen: node, process family, die area, PDK/NDA path, DRC/LVS status, package/test assumptions, timeline and compliance context.

No GDS, no upload. This page stores nothing and sends nothing. Do not paste GDS, netlists, RTL, schematics, masks, layer maps or confidential design IP into a public browser tool.

Inputs

Use only non-confidential first-screen information. Approximate values are enough.

The checker warns if the notes look like confidential design detail.

Intake gates

0
readiness score
Needs basics

Fill the fields to check first-screen readiness.

    Cautions

      Confidentiality

        Generated readiness brief

        
                
        Submit RFQ
        Copied