News & insights.
Search-focused guides on mature-node MPW, P&ID-to-native-SOLIDWORKS assembly, open engineering tools, industrial sourcing and semiconductor materials.
Start by topic
MPW guides, access and cost
Tapeout basics, node selection, access routes, dies, packaging, test and RFQ readiness.
P&ID / SOLIDWORKSNative assembly automation
UHP gas design, SEMI F82, rule checks, feature trees, BOM context and CAD automation.
Industrial SourcingParts, BOM and RFQ sourcing
VCR fittings, MFCs, valves, seals, obsolete alternatives, BOM normalization and logistics.
MPW / Tapeout
How Many Dies Do You Get from an MPW Shuttle?
Why MPW sample count depends on die size, wafer share, yield, dicing, packaging and test choices.
MPW Node Selection: 0.35um, 180nm, 65nm, 40nm and 28nm Tradeoffs
A practical node-selection guide for mature-node MPW scoping across analog, mixed-signal, RF, BCD, high-voltage and digital prototype needs.
Sky130 and Open-Source Silicon MPW Options After eFabless
How Sky130, TinyTapeout-style and open-source silicon teams should evaluate MPW route fit, PDK dependency, DRC/LVS status, package and eligibility.
GDSII, DRC and LVS Requirements for MPW Tapeout
What MPW teams should prepare before layout handoff: top cell, layer map, DRC/LVS status, waivers, pad ring, package context and manifest.
How to Tapeout a Chip: First Silicon Checklist
A practical first-silicon checklist covering process choice, PDK, EDA flow, DRC/LVS, pad ring, package, test and non-confidential MPW intake.
How Much Does Chip Tapeout Cost? MPW vs Full Mask Cost Drivers
Chip tapeout cost depends on node, process family, die area, MPW eligibility, package, test and schedule. Use this guide before asking for a quote.
Multi-Project Wafer (MPW) Shuttle: Complete Guide for First Silicon
A complete MPW shuttle guide for first silicon: what MPW means, who uses it, what affects cost and schedule, and what to prepare before…
What Information Is Needed for an MPW RFQ?
A good MPW RFQ is not a data dump. It is a clear, non-confidential summary that lets the coordination team screen process fit, readiness,…
Can You Start an MPW RFQ Without GDS?
A first MPW RFQ should protect design IP. Start with non-confidential requirements, then move to NDA, PDK and partner-confirmed review before any design detail…
MPW vs Full Mask: Which Tapeout Route Should You Choose?
MPW is usually a prototype and validation route. Full mask is usually a dedicated route for mature designs, larger volumes and stronger production control.
Done reading? Tell us what you are building or sourcing.
Send a part number, a BOM, semiconductor materials list, high-level MPW brief, or a P&ID-to-SOLIDWORKS assembly automation scope. We return an indicative read and route the work to the right MST path.