Request MPW readiness review

Open MPW vs commercial 55nm and 90nm shuttles

An open MPW program can put a small test design on silicon using the shuttle’s PDK and test interface. Consider a commercial 55nm or 90nm shuttle when your prototype needs the target process’s devices, I/O, memory, packaging or signoff flow. Start the port with the requirements and tests you can reuse, then build the layout for the approved PDK.

What each route can help you prove

Use a learning shuttle when the main question is whether a small function works in silicon and you can use the project’s interface and disclosure terms. If your prototype needs a specific commercial process option, package pinout or electrical limit, obtain those requirements from the operator before starting the port.

Scroll the table to see all columns.

Decision Open-PDK shuttle example What to confirm for a commercial prototype
Access and IP rights Tiny Tapeout’s participation terms describe public release of submitted designs and documentation, with Apache-2.0-compatible licensing. Tiny Tapeout participation terms, sections 1 and 4 Check applicant eligibility, NDA and PDK terms, in-project IP rights, and which files may be exchanged through the program.
Rules, area and I/O Tiny Tapeout defines the integration interface and publishes specs for clock, GPIO and analog connections. Check the tile and pin limits for the named shuttle. Tiny Tapeout technical specifications Confirm the accepted layer stack, I/O voltages, pad and seal ring, die dimensions and minimum billable area. Plan probe access or a package pinout.
Devices and macros SKY130 and IHP SG13G2 document different 130nm technologies and device libraries. Both open PDK documentation sets describe their current releases as experimental previews. SkyWater SKY130 PDK documentation, Current Status · IHP SG13G2 Open PDK documentation, Current Status Check the approved device models, analog performance over corners, isolation and voltage limits, digital cells, and licensed memory or other hard macros for the exact process option.
Verification Tiny Tapeout documents a submission check that rejects a build hardened for a different shuttle PDK. Tiny Tapeout FAQ on PDK hardening and devkits Rebuild for the target PDK. Use the approved tools and decks for design rule checking, layout-versus-schematic, parasitic extraction and the timing or analog checks required at handoff.
Samples and bring-up Tiny Tapeout describes a demo board and ASIC breakout for its devkit. Check the chosen shuttle’s hardware and purchase terms for the actual deliverable. Tiny Tapeout FAQ on PDK hardening and devkits Confirm whether the quote covers bare die, packaged samples or other delivery, and agree quantity, wafer probe, assembly, electrical test and expected shipment milestones.

Porting an SPI proof of concept

Suppose a SKY130 test chip verifies that an SPI controller resets and exchanges frames with the shuttle’s breakout board. The commercial prototype needs a 1.8 V sensor interface and an on-chip comparator. Keep the frame and reset regression tests. Write a pin map with the supply domains, required input voltage and thresholds, and routes for probing or packaging the comparator output.

Ask the commercial process owner to confirm the matching pad cells, any level shifting and the comparator’s device options. Then rebuild against those libraries. Plan separate first-silicon checks for frame transfer at the intended I/O voltage and for comparator threshold and hysteresis under the agreed conditions.

Before switching processes

  1. Write the test objective. Record the functions and electrical limits that need fresh silicon evidence, along with the test conditions and pass criteria.
  2. List what you can carry over. Identify the RTL, testbenches, board firmware and reusable IP. Record the owner, version and reuse or disclosure terms for each.
  3. Confirm the process and run. Get the eligible variant, PDK revision, verification tools, data deadline and acceptance steps from the operator. Use the agreed protected route for design files.
  4. Map the process-dependent blocks. Estimate new area for pads and routes. Assign an owner for any replacement I/O, analog devices, cells and memory macros.
  5. Agree on the checks to rerun. Identify the target’s layout, extraction, timing, power and analog corner reports along with the required handoff format.
  6. Put sample scope into the quote. Record the sample form, count, package or probe access, bring-up hardware and test responsibilities. Compare schedules using the data deadline and expected sample date.

For commercial follow-up, review the 55nm process and memory questions or the 90nm analog and power-device questions. The MPW Access Map identifies public operators, and the MPW Planner helps document new die dimensions and reticle assumptions.

Common questions when moving to a commercial shuttle

Can I submit SKY130 GDS to a commercial 55nm or 90nm shuttle?

Build new physical layout using the accepted target PDK, layers, devices and rule decks. You may be able to reuse requirements, technology-independent RTL, and tests where you have the rights. Rebuild and verify the netlist and layout for the selected process.

Does an open PDK settle the licence for the whole chip?

Check the exact PDK release, every incorporated block and the selected program’s own terms. Record the rights to reuse or disclose RTL, macros, fonts or artwork, firmware, board files and documentation with the teams that own them.

Can I use the same sample test plan?

Carry forward the measurements and pass criteria that still apply. Replace the harness assumptions with the accepted package or probe interface, voltage domains, pin mapping and test conditions for the new sample.

Source documents