90nm BCD MPW options for power-management prototypes

A 90nm bipolar-CMOS-DMOS (BCD) prototype needs a process option that combines the required power devices, analog circuitry and digital control. Hua Hong and TSMC document 90nm BCD production. Confirm the specific device options and prototype shuttle before committing the layout or its schedule.

Compare the process and the route

MST Singapore coordinates HHGrace MPW for overseas projects as a non-exclusive agent. For the other platforms below, contact the foundry or the named program operator about access. Start with the device and library fit, then confirm which run accepts that process option.

Scroll the tables to see all columns.

Route What the public material establishes What to confirm for the prototype
HHGrace 90nm through MST Hua Hong reports stable production of 90nm BCD. MST publishes January, May and September as 2027 planning months for its 90nm route. Hua Hong’s 2025 annual report, printed page 38 · MST 90nm planning calendar Confirm the eligible BCD variant, device library, NDA and PDK access, data deadline, sample form and written quotation.
TSMC 90nm BCD TSMC describes volume production of the 90nm BCD platform. TSMC BCD technology Ask TSMC or the relevant access provider which 90nm BCD variant and prototype program apply. Obtain the schedule and entry terms for that program.
GlobalFoundries 130BCD or 180BCD GlobalFoundries publishes separate 130BCD and 180BCD platforms. Consider these nodes if your specification allows a process redesign. GlobalFoundries BCD technology, 130BCD and 180BCD sections Establish the device and IP fit for the target platform. Confirm an eligible prototype program and estimate the porting and verification effort.
UMC BCD portfolio UMC describes a BCD portfolio spanning several nodes and voltage options. UMC BCD technology · UMC Silicon Shuttle Ask UMC which device platform is available to your project and confirm the approved PDK and the specific shuttle for that option.

A power-management IC (PMIC) team comparing nodes should first agree which requirements can move. A design already validated against a specific PDK or licensed IP library may require new device sizing, layout, verification and licensing on another process.

Compare operators and eligibility in the MPW Access Map.

Write down the electrical conditions the foundry needs

Start with the voltage rails, worst-case transients and estimated die dimensions. Include the measurements you need from first silicon.

Design input What the engineering review should resolve
Operating voltage and transients Identify nominal rails, maximum applied voltage, expected transients and the operating environment for each power device.
Switch targets State the on-resistance (RDS(on)) target and the gate drive, junction temperature and current at which you will measure it. Compare device options under the same conditions.
Integration Identify isolation, analog device, memory, digital library and I/O needs. Ask which devices and libraries are supported together in the specific PDK.
Reliability and samples Define the safe operating area (SOA), thermal and package constraints, process-corner checks, and sample quantity or delivery form. Scope downstream packaging and test separately.
Project timing Record the target data-in month and the deadline for receiving samples as two independent requirements. Confirm both with the operator.

For example, a team designing for a 12 V nominal supply should describe the highest switch-node transient and the junction temperature at which the on-resistance target must hold. With the rail, transient, gate drive and drain current written down, the process owner can check the required device and safe operating area against its documentation before the team selects a PDK.

Review the HHGrace 90nm route for its review and sample handoff. Use the MPW Planner to outline the reticle allocation and the MPW Estimator to check early area and budget assumptions.

Questions to ask before selecting a shuttle

Does a 90nm BCD process listing include a shuttle date?

A technology page establishes the documented capability. Use the operator’s schedule or written confirmation to record the specific process option, application eligibility and each milestone.

Which costs should be in a PMIC prototype quote?

Ask for the booked silicon area, applicable minimum area, device or mask options and the delivered sample quantity. Request a separate line for IP, dicing, packaging or electrical test wherever it applies.

What can I send before an NDA?

Share a high-level application, operating ranges, estimated die dimensions, preferred month and what you need to receive. Keep design files and proprietary implementation information for the agreed protected channel.